Well all the bank stuff is done!!! They have the signed documents and are ready to do our payment when required.
Final drawings turned up in the mail last night and are now all signed, sealed and hopefully delievered on monday! In with our final drawings there was a PCV which Henley did on our behalf as we chose a structural option and they had to shorten our kitchen bench by 180mm so they changed it on the plans and gave us a $106 rebate!
Spoke to our administrator and she said our site start was still looking good for next Friday! Lets see what happens!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment