Well the house is well on its way to being finished... these photos are from monday as we are now 100% locked out so not sure what else has been done... allt hat was left to be done on monday was basins to be put in and taps for basins, tiles to be fixed on bath, render to be top coated and shower screens. Went up on tueesday but they had cleaned the house and completely locked us out.... eagerly awaiting our inpsection now!
Front door handle (regretting not changeing it but its now on the to do list)

Shower all fitted out

Ensuite towel ladder

Ensuite toilet

bath has been fitted - they did it ass about had to remove tiles to connect it up

Close up of connections nice to see some left over bricks came in handy!
Our taps

Bathroom towel rail

Kitchen sink

Outside tap

Door handle throughout (will change front to same)
Looks awesome Cinny!!
ReplyDelete